File #: 14-509    Version: 1 Name: Monarch Bay Drive Bridge Maintenance and Repair ACCEPT (SR)
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 12/15/2014 Final action: 12/15/2014
Enactment date: Enactment #:
Title: Staff Report for a Resolution Accepting the Work for the Monarch Bay Drive Bridge Maintenance and Repair Project, Project No. 12-150-38-324
Sponsors: Uchenna Udemezue
Related files: 14-507
Title
Staff Report for a Resolution Accepting the Work for the Monarch Bay Drive Bridge Maintenance and Repair Project, Project No. 12-150-38-324
 
Staffreport
SUMMARY AND RECOMMENDATIONS
 
Staff recommends acceptance of the work by Vortex Marine Construction, Inc., filing of the Notice of Completion, release of the performance and payment bonds, and release of the maintenance bond upon completion of the one year maintenance period.
 
BACKGROUND
 
The City owns and maintains several bridges, some of which are periodically inspected by Caltrans.  Recent inspection reports for the bridge that carries Monarch Bay Drive over the Estudillo Canal (located immediately south of Marina Park) indicate that some of the concrete is damaged and that the bank at the northern abutment has eroded to the point that the abutment foundations are exposed.
 
The project repaired damaged concrete on the underside of the bridge, rebuilt the embankment at the northern end of bridge, and sealed the bridge deck.
 
Analysis
 
This project installed the above described improvements.  The work was performed in compliance with the contract documents and is now complete.
 
Current Agency Policies
 
Maintain and enhance the City's infrastructure.
 
Previous Actions
 
On January 21, 2014, by Resolution No. 2014-006, the City Council awarded a contract for construction of the work to Vortex Marine Construction, Inc.
 
Applicable General Plan Policies
 
Policy 52.07: Ensure that sufficient funding is provided for the ongoing maintenance of City-owned facilities, including streets, street lights, traffic signals, landscaping, street trees, storm drains, public buildings, and other infrastructure.
 
Permits and/or Variances Granted
 
This work was done under the following permits and/or approvals:
·      U.S. Army Corps of Engineers Permit
·      San Francisco Bay Conservation and Development Commission Permit
·      California Department of Fish and Wildlife Authorization
·      San Francisco Bay Area Regional Water Board Certification
·      Alameda County Flood Control Permit
 
Environmental Review
 
This project is categorically exempt from CEQA per section 15302(c): Replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity.
 
Fiscal Impacts
 
The total cost of this project is $315,000.  A summary of the cost of the construction contract with Vortex Marine Construction, Inc. is tabulated below.
 
Original Contract:      $243,600
Change Orders:      $    1,369
Total Contract Amount:      $244,969
 
Budget Authority
 
This project was funded by Measure B Streets & Roads funds in account 144-38-324, authorized in the City's FY11-12 Adopted Budget, and a federal grant under the Bridge Maintenance and Repair Program in account 150-38-324, which was appropriated with the contract award.
 
PREPARED BY:  Nick Thom, Senior Engineer, Engineering and Transportation Department