File #: 13-248    Version: 1 Name: Stenzel Park Drainage - P&S SR
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 6/3/2013 Final action: 6/3/2013
Enactment date: Enactment #:
Title: Staff Report for a Resolution Approving Plans and Specifications and Calling for Bids for the Stenzel Park Drainage Project, Project No. 2003.0720
Sponsors: Uchenna Udemezue
Related files: 13-249

Title

Staff Report for a Resolution Approving Plans and Specifications and Calling for Bids for the Stenzel Park Drainage Project, Project No. 2003.0720

 

Staffreport

SUMMARY AND RECOMMENDATIONS

 

Staff recommends approval of the plans and specifications and a call for bids for the subject project.

 

BACKGROUND

 

On March 2, 2009, the City received notice from the East Bay Regional Parks District (EBRPD) of its eligibility for $3,740,998 in Measure WW Park Bond funds.  The funds are for the development of neighborhood, community and regional parks and recreation lands and facilities.  After completing a community process, the City developed a ranked list of City park improvement projects for the City Council to consider funding with the Measure WW funds.  In the 2010-2011 fiscal year budget, nine projects, including the Stenzel Park Drainage Project, were approved as part of the Capital Improvement Program.

 

Analysis

 

The northwest portion of the ball field at Stenzel Park was identified by Staff as an area of ponding water.  This is an ongoing issue, recurring each winter, which affects the usability of the field and creates maintenance problems.

 

This project will remove sections of turf and the upper layer of soil in the ponding area. An underground drainage system will be installed to increase the field’s tolerance for water.  The surface will be repaired with new top soil and sod.

 

Previous Actions

 

On February 17, 2009, by Resolution No. 2009-023, City Council approved a resolution authorizing the application for local grant funds from EBRPD under Measure WW, the Park Bond Extension.

 

Applicable General Plan Policies

 

This project is consistent with General Plan Goal No. 21 – Rehabilitation of existing parks.

 

Environmental Review

 

The project was determined Categorically Exempt under the California Environmental Quality Act (CEQA) pursuant to Section 15061(b)(3).  A notice to this effect was filed with the County on March 26, 2010.

 

Fiscal Impacts

 

The total cost of the project is $180,415, including design, construction and inspection staff time.  Construction is estimated to cost $139,485.

 

Budget Authority

 

The improvements will be funded using Measure WW bond funding in existing account 150-62-114, approved as part of the 2010-2011 CIP Budget. 

 

 

PREPARED BY:  Nelson Lam, Assistant Engineer, Engineering and Transportation