File #: 20-376    Version: 1 Name: Accept Work at 2756 Alvarado St - SR
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 10/5/2020 Final action: 10/5/2020
Enactment date: Enactment #:
Title: Staff Report for a City of San Leandro City Council Resolution to Accept Public Improvements Associated with a Private Development at 2756 Alvarado Street
Sponsors: Keith Cooke
Related files: 20-377
Title
Staff Report for a City of San Leandro City Council Resolution to Accept Public Improvements Associated with a Private Development at 2756 Alvarado Street

Staffreport
SUMMARY AND RECOMMENDATIONS

Staff has prepared a resolution to accept the public improvements completed associated with a private development at 2756 Alvarado Street. These public improvements include:
* Traffic Signal Modifications
* Storm Drain Inlets
* Curb Ramps

Staff recommends accepting the public improvement work by the developer IPT Alvarado Commerce Center LP (Property Owner) and authorizing the City Manager to release the performance and payment bonds, and upon completion to the satisfaction of the City Engineer of the one-year maintenance period, to release the Maintenance Bond for the subject project.

BACKGROUND

The City issued approvals and permits for a private development at 2756 Alvarado Street consisting of the demolition of three existing connected buildings and subsequent redevelopment of the 6.9-acre site with a new 159,450 square foot building
and entered into a public improvement agreement with the Property Owner for public improvements that include:

* Upgrading the left turn phasing of an existing traffic signal from protective to protective-permissive at the intersection of Aladdin Avenue and Alvarado Street;
* Connecting the traffic signal to the City's fiber optic communication line;
* Reconstructing sidewalks and curb ramps;
* Constructing new and relocating existing storm drain inlets; and
* Relocating a joint utility pole.

Analysis

The work described in the public improvement agreement is complete. The work was inspected and found in compliance with the contract documents and City standards.

A maintenance bond to guarantee the repair of defects for a period of one year was received, and the bonds guaranteeing performance and payment for the work can be released.

Current Agency Policies

* Maintain and enhance San Leandro's infrastructure
* Advance pro...