File #: 14-272    Version: 1 Name: Fiber Broadband Network - AWARD (SR)
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 7/7/2014 Final action: 7/7/2014
Enactment date: Enactment #:
Title: Staff Report for a Resolution Awarding a Construction Contract to Flatiron Electric Group, Inc. for the Fiber Conduit for Broadband Network Project, Project No. 2013.0320
Sponsors: Uchenna Udemezue
Attachments: 1. Fiber Conduit Bid Summary
Related files: 14-273
Title
Staff Report for a Resolution Awarding a Construction Contract to Flatiron Electric Group, Inc. for the Fiber Conduit for Broadband Network Project, Project No. 2013.0320

Staffreport
SUMMARY AND RECOMMENDATIONS

The subject project will install conduit and pull boxes ready for the insertion of fiber optic communication cable.

Staff recommends that the City Council award the contract to the lowest responsible bidder, Flatiron Electric Group, Inc., in the amount of $1,325,350.00 for the subject project.

BACKGROUND

In partnership with Lit San Leandro and to promote business growth in the local area, the City desires to expand its high speed communication infrastructure into underserved industrial areas of the City. The City applied for and acquired grant funding from the United States Economic Development Agency (EDA) for installation of communications conduit. The project will expand the City's communications network capability by installing approximately seven miles of conduit ready to receive fiber optic cable.

The project included, as a base bid, the installation of a single two (2) inch diameter conduit. During the design process, an alternative installation of three 1-1/4 inch diameter conduits was considered. This alternative had advantages over the single conduit if additional fiber optic cable installations were desired in the future. Solicitations for bids included requests for both conduit options. The base bid option was designated as the method for determining the order of bids.

Analysis

The bids were opened on June 24, 2014. Six (6) bids were received ranging from $1,258,262 to $3,669,080 for the base bid option. Flatiron Electric Group, Inc. (Flatiron) was determined by staff to be the lowest responsible bidder. Flatiron's proposal for the optional conduit was $67,088. Flatiron's total construction cost of $1,325,350 is within the engineer's estimate for all work of $1,740,465. Staff therefore recommends the incl...