File #: 18-484    Version: 1 Name: Accept WPCP AC Replacement (SR)
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 2/19/2019 Final action: 2/19/2019
Enactment date: Enactment #:
Title: Staff Report for a City of San Leandro City Council Resolution to Accept the Work for the Water Pollution Control Plant Asphalt Replacement Project, Project No. 2015.0260
Sponsors: Keith Cooke
Attachments: 1. Acceptance Photo Page
Related files: 18-485
Title
Staff Report for a City of San Leandro City Council Resolution to Accept the Work for the Water Pollution Control Plant Asphalt Replacement Project, Project No. 2015.0260

Staffreport
SUMMARY AND RECOMMENDATIONS

This project replaced deteriorated asphalt concrete pavement at the City's Water Pollution Control Plant (WPCP).

Staff recommends the following actions:
* Accept the work of McGuire and Hester;
* Direct staff to File the Notice of Completion; and
* Authorize the City Manager to release the performance and payment bonds, and release the maintenance bonds for the subject project upon successful completion of the one-year maintenance period.

BACKGROUND

This project replaced approximately three acres of asphalt pavement and cement-treated to strengthen the underlying unstable subgrade at the City's Water Pollution Control Plant.

In addition to new paving, this project improved site drainage by adjusting site grades and installing concrete drainage swales. The project also extended a storm drain line and installed an inlet in an area at the northeast corner of the plant which frequently flooded.

This project installed 1,300 linear feet of joint utility trench to provide compressed air and water service to sixteen separate locations spread throughout the WPCP. These service lines will allow improved efficiency at the facility by providing easier access to these utilities, which are used for maintaining and operating the onsite equipment.

Analysis

Contract work was completed and was performed in compliance with the contract documents and City standards.

This contract was performed under the Community Workforce Agreement (CWA), which established the Alameda County Building and Construction Trades Council and its affiliated labor unions as the sole bargaining representative of all persons working on City construction projects valued above $1,000,000. The CWA sets a goal of 30% participation by San Leandro residents at the level of journeymen ...

Click here for full text