File #: 19-326    Version: 1 Name: Reject All Bids for Farrelly Pool Replacement (SR)
Type: Staff Report Status: Filed
In control: City Council
Meeting Date: 7/15/2019 Final action: 7/15/2019
Enactment date: Enactment #:
Title: Staff Report for a City of San Leandro City Council Resolution to Reject All Bids for the Farrelly Pool Replacement Project No. 2018.3420.
Sponsors: Keith Cooke
Attachments: 1. Bid Results.pdf
Related files: 19-327
Title
Staff Report for a City of San Leandro City Council Resolution to Reject All Bids for the Farrelly Pool Replacement Project No. 2018.3420.

Staffreport
SUMMARY AND RECOMMENDATIONS

The project provides for the replacement of the Farrelly Pool facilities. Two bids were received for construction. One bid was considered non-responsive. The apparent low bidder's bid exceeded the engineer's estimate by 44%, which would increase project cost 87% above the project's current funding.

Staff recommends rejecting all bids from the June 25, 2019 bid opening for the subject project.


BACKGROUND

The Farrelly Pool facility is on the campus of Roosevelt Elementary School, located at 864 Dutton Avenue, San Leandro. The City leases the pool property from the San Leandro Unified School District (SLUSD) and maintains and operates the facility. SLUSD does not provide swim education at this location and does not use this aquatic facility for educational purposes.

This project is the second phase of a 2-phase project; phase 1 is the demolition contract, which was awarded in May 2019. Phase 1 started in June. Phase 2 is the construction of the replacement swimming pool facility. The swimming pool facility will be comprised of a standard 75' length for lap swimming and 62' width to provide a new 4,650 square foot pool. The pool will be oriented with a 2'-6" deep shallow end closest to the facility entry for safety and will have six lanes for lap swimming, four of which will have 6'-6" deep water which is deep enough to allow the use of diving blocks. The project also includes American with Disabilities Acts (ADA) compliant public changing rooms and restrooms and a staff area with a first aid station and training space. The new facility will be completely fenced off from the school property and all access to the facility will be from Gill Lane, a public alley.

A Master Agreement between SLUSD and the City for recreational use and maintenance of school sites that covers Fa...

Click here for full text